The project is a 100,000 m² jointless concrete floor for a new distribution center for Zalando, a popular Europe-based fashion and beauty web shop. The floor space is located in Lodz, Poland and consists of panels with thicknesses up to 200 mm.
Tomasz Chibowski, co-owner and Managing Director of Fibre System explains why his company preferred working with Bekaert and why they chose Dramix® steel fiber concrete reinforcement for this project.