The Dubai Expolink Route 2020, is a 15 km (9.3 mi) extension of the Dubai Metro red line that runs from Nakheel Harbour and Tower Station to the Dubai Expo site. About 11.8 km (7.3 mi) of the line runs above ground, about 3.2 km (2 mi) runs underground. The tunnels have a precast lining reinforced with Dramix® 4D steel fiber concrete reinforcement.