WestConnex is a 33-kilometer (21 mi) predominantly underground motorway tunnel network in Sydney, New South Wales, Australia. Its walls are lined with two permanent sprayed layers: one is a fiber reinforced primary support lining, the other is a fiber reinforced concrete smoothing layer. Both are reinforced with Dramix® 4D 65/35 steel fiber for optimal load-bearing capacity.