Date article: 23 January 2024

phys.org

Located in Woodbine, Georgia, the plant is designed to produce 15 tons per day (TPD) of liquid electrolytic hydrogen – enough to power approximately 15,000 forklifts per day. Through eight 5-megawatt (MW) PEM electrolyzers, water is separated into hydrogen and oxygen. The hydrogen gas is then condensed into liquid form at -423F to be delivered to customers’ hydrogen fueling stations through Plug’s logistics network using Plug cryogenic trailers.